1. Basic situation of Larsen steel sheet piles

(1)Origin of the name

 

English name: Lassen Steel Sheet Pile or Lassen Steel Sheet Piling. Because many people in China are accustomed to referring to channel steel as steel sheet pile, in order to distinguish it from channel steel, it is translated as Larson steel sheet pile.

 

(2)Use

Larson steel sheet piles have a wide range of uses. In permanent structures, they can be used in docks, unloading yards, embankments, retaining walls, retaining walls, breakwaters, diversion embankments, docks, gates, etc.; in temporary structures, It can be used for mountain closure, temporary bank expansion, flow interruption, bridge cofferdam construction, large pipeline laying, temporary ditch excavation, soil retaining, water retaining, sand retaining, etc.; in flood fighting and rescue, it can be used for flood control, collapse prevention, quicksand prevention, etc. .

 

(3) Product specifications

According to the cross-sectional shape and use of steel sheet piles, they are mainly divided into three shapes: U-shaped, Z-shaped, and W-shaped steel sheet piles. At the same time, they are divided into light and ordinary cold-formed steel sheet piles according to the wall thickness. Light steel sheet piles have a wall thickness of 4 to 7 mm, and ordinary steel sheet piles have a wall thickness of 8 to 12 mm. U-shaped interlocking Larson steel sheet piles are mostly used throughout Asia, including China.

 

The products are divided into two types according to the production process: cold-formed steel sheet piles and hot-rolled steel sheet piles. In engineering construction, cold-formed steel sheet piles are more cost-effective, and in engineering applications, the two types can be substituted for each other.

 

(5)Main advantages

① Simple construction, shortened construction period, good durability, and a lifespan of more than 50 years;

②The construction cost is cheap, the interchangeability is good, and it can be reused;

③Able to reduce space requirements;

④The construction has significant environmental protection effects, greatly reducing the amount of soil taken and the amount of concrete used, effectively protecting land resources.

 

2. Construction method of Lassen Steel Sheet Pile

At present, the commonly used piling methods in China mainly include: crawler hydraulic excavators equipped with special piling fixtures (manipulators), various types of cranes, hydraulic vibrating hammers, static pressure pile drivers, etc. for piling. Each of the three methods has its advantages and disadvantages and should be selected according to the actual situation. In the Kunming area, crawler hydraulic excavators are often replaced with special piling fixtures (robots) for piling.

 

The commonly used construction method is the screen driving method. That is: during construction, insert 10 to 20 steel sheet piles into the guide frame in rows to make it look like a screen, and then drive the piles one by one. The screen-type driving method is less likely to cause buckling, torsion, inclination, and unevenness of the wall surface of the sheet piles. It has high driving accuracy and is easy to achieve sealing and closing. At the corner, corner steel sheet piles are usually used to achieve the turning of the trench or the closing of the steel plate village. Before piling, apply grease to the lock of the steel sheet pile to facilitate driving and pulling out.

 

After the Larsen steel sheet pile piling is completed, in order to ensure the stiffness, strength and stability requirements of the support rods, lateral supports will be designed at the ends of the supports. If necessary, the support rods will be connected through tie beams and designed to be reinforced concrete. Truss form. For larger spans, supporting columns must be installed in the supporting beams.

 

After the foundation pit is backfilled, the steel sheet piles must be removed for reuse. Before removing steel sheet piles, the sequence and time of pulling out piles and soil hole treatment should be carefully studied. Otherwise, the vibration of pile extraction and excessive soil on pile extraction will cause ground settlement and displacement, which will bring harm to the constructed underground structure and affect the safety of nearby original buildings, structures or underground pipelines.

 

Commonly used methods for pulling out piles: Use vibrating hammers to pull out piles: the forced vibration generated by the vibrating hammer is used to disturb the soil and destroy the cohesion of the soil around the steel sheet piles to overcome the pile pulling resistance, and rely on the additional lifting force to pull out the piles. For sheet piles that are difficult to pull out, you can first use a diesel hammer to vibrate the pile down 100-300mm, and then alternately vibrate and pull out the pile with a vibrating hammer.

 

When pulling out piles, efforts should be made to reduce the soil or backfill brought out by pulling out piles. Currently, water and sand filling measures are mainly used. The pile holes left after pulling out the piles must be backfilled in time.

Article source: https://article-realm.com/article/Business/61675-Lassen-Steel-Sheet-Pile.html

Comments

No comments have been left here yet. Be the first who will do it.
Safety

captchaPlease input letters you see on the image.
Click on image to redraw.

Reviews

Guest

Overall Rating:

Statistics

Members
Members: 17271
Publishing
Articles: 79,985
Categories: 202
Online
Active Users: 770
Members: 3
Guests: 767
Bots: 16045
Visits last 24h (live): 4168
Visits last 24h (bots): 53576

Latest Comments

Interesting post. I Have Been wondering about this issue. so thanks for posting. Pretty cool post.It 's really very nice and Useful post.Thanks amanahtoto    
Great knowledge, do anyone mind merely reference back to it amanahtoto    
Very rapidly this site will be famous among all blogging and site-building users, due to it's good articles amanahtoto  
Excellent information providing by your Article thank you for taking the time to share with us such a nice article.  amanahtoto  
I am happy to find this post very useful for me, as it contains lot of information. I always prefer to read the quality content and this thing I found in you post. Thanks for sharing  amanahtoto...
You have observed very interesting points ! ps decent internet site . pakde4d  
I read this article. I think You put a lot of effort to create this article. I appreciate your work.  pakde4d    
Greatly composed article, if just all bloggers offered a similar substance as you, the web would be a much better spot. amanahtoto  
Short and simple explanations are sometimes easier to follow than long articles.  카지노 방송
on Nov 5, 2026 about The Latest Online Business
Comparing information from different sources made the overall process much easier to understand.  프라그티비 평생도메인
on Nov 5, 2026 about The Latest Online Business

Translate To: