In the construction process, the same set of guide feet of the pile hammer and the landing gear of the pile hammer are used when the piles of various specifications are built.

 

Construction method:

Pre-construction preparations: make necessary transfer and review of the surveying plane control network points, leveling points and design drawings; measure the mud surface markings of the pile sinking area; arrange the pile sinking sequence according to the plan layout of the pile position and the engineering requirements and construction conditions , And prefabricated and processed in order to arrange foundation pile transportation and pile sinking work.

 

Anchor Positioning Wharf 1#, 2# The water depth at the sea side of the berth wharf is above 15m, the pile ship is positioned on the sea side when the wharf is built, and can be anchored directly (except for the head cable); the wharf shore is a silty shoal, and the pile sinking area is offshore It is relatively close and is not suitable for anchoring. It is necessary to bury ground cattle with cables to go ashore.

 

If the pile hammer is lifted and dropped in the form of an integrated hoisting pile with the former pile hammer, it may exceed the mechanical load and strength limit of the related supporting equipment. Because the shaft diameter of the fixed pulley set of the pile hammer landing gear is φ100mm, and because it only supports two pulleys, if the fixed pulley set is used to directly lift the pile hammer with a weight of more than 61t and replace it, plus the friction coefficient, it will inevitably exceed The strength limit of the fixed pulley block. In addition, the rated load of the hammer hoist is 120k N. If the hoist is used to directly lift the pile hammer and alternate driving, the mechanical load of the hoist is also exceeded. In addition, not only the strength of the pile hammer lifting block cannot meet the weight of simultaneously lifting and lowering the pile hammer and the replacement hammer; moreover, if the 2×150k N double drum winch is used to lift the pile hammer and the replacement hammer at the same time, only the aircraft frame can be used. To hoist the weight in the form of a special order, not only must the supporting equipment be specially customized, but also the hammer wire rope and the hook wire rope are on the same parallel line, and a slight surge will cause a mechanical accident. Considering the above factors comprehensively, in the process of constructing φ2600m m steel pipe piles, it was decided to use the method of lifting and lowering the pile hammer and the alternative driving separately, that is, instead of lifting the pile hammer with a 120K N hoist, use 2×150k. N double drum hoist to lift and lower to ensure the safety of construction.

Article source: https://article-realm.com/article/Internet-Business/Security/16453-Analysis-on-the-Technology-of-Large-Diameter-Steel-Pipe-Piles-in-High-Pile-Wharf.html

Comments

No comments have been left here yet. Be the first who will do it.
Safety

captchaPlease input letters you see on the image.
Click on image to redraw.

Reviews

Guest

Overall Rating:

Statistics

Members
Members: 16732
Publishing
Articles: 78,409
Categories: 202
Online
Active Users: 5191
Members: 8
Guests: 5183
Bots: 7007
Visits last 24h (live): 16508
Visits last 24h (bots): 39331

Latest Comments

This list is useful for entrepreneurs comparing crypto exchange development companies in India, the USA, and the UK. When choosing a provider, review portfolio quality, security features,...
If you are looking for a top-tier Russian Delhi Call Girls Service , browse our verified profiles for the best experience.
on Jul 21, 2026 about Nice Girls Do It, Too!
When the demands of your schedule leave little room for error, booking a VIP Delhi Escorts Service becomes the most logical choice. True luxury is found in the sanctity of privacy, and these...
Stickman Hook is suitable for all ages, appealing to everyone from casual players to those who enjoy challenging their skills and chasing speed records.
We are a party with people we know because they are both really warm and interested in fun. Our Dwarka Escorts Service connections are genuine with each and every client. This authenticity...
on Jul 20, 2026 about Best SAP Training in Mumbai
Are you looking for excitement and pleasure tonight? Escorts Service in Gurgaon offers instant booking with beautiful escorts available. Our girls provide an exceptional experience tailored to...
There will be fresh difficulties for all players, from those with zero runs under their belts to those with hundreds. moto x3m
This is such a well-written and inspiring post! I love the way you present your ideas, and the visuals you included make it even better. In today's digital world, having high-quality, crisp images...
이 기사는 기사 역사상 최고 중 하나입니다. 나는 골동품 'Article'수집가이고 때때로 그것들을 흥미롭게 읽습니다.  마리오 도메인 주소      
Thank you for your blog. It's awesome!  마리오토토  

Translate To: