Seepage and sand gushing

1) Phenomenon: When the excavation of the foundation pit was halfway through, the leakage of the steel sheet pile was found, mainly at the joints and corners, and sand was still gushing in some places.

2) Reason analysis:

A. There are many old Larsen steel sheet piles, which have not been calibrated and repaired before use or the overhaul is incomplete, and the water-locking parts are not well engaged, so that the joints are prone to water leakage.

B. In order to close the corners, there should be a special form of corner piles. Such corner piles must undergo cutting and welding procedures, which may be deformed.

C. When laying Larsen steel sheet piles, the locks of the two sheet piles may not be inserted tightly and do not meet the requirements.

D. The verticality of the Larson steel sheet pile does not meet the requirements, resulting in water leakage in the lock.

 

3) Preventive measures:

The old steel sheet piles need to be rectified before they are set up. The correction should be carried out on the platform, and the bending deformation of the steel sheet pile can be corrected by means of hydraulic jack pressing or fire drying. Prepare the purlin bracket to ensure that the steel sheet pile is driven vertically and the steel sheet pile wall is straight after driving. To prevent the displacement of the centerline of the steel sheet pile lock, a clamping plate can be set at the steel sheet pile lock in the direction of the pile driving to prevent the displacement of the sheet pile. Because the steel sheet piles are inclined when driving and there are gaps in the lock joints, it is difficult to close the closure. The first solution is to use special-shaped sheet piles (this method is more difficult); the second is to use the axis closure method (this method is more convenient).

 

Steel sheet pile roll

1) Phenomenon: The excavator and the earth-moving vehicle that used the steel sheet pile to excavate the earth were set on the side of the ground steel sheet pile. Soon after the excavation, it was found that the top of the steel sheet pile was tilted, the soil at the bottom of the pit was raised, and the ground cracked and sunk.

 

2) Reason analysis:

A. These steel sheet piles are constructed in soft soil areas, and the designed embedment depth is not enough, so the ground behind the piles sinks and the pit bottom soil uplifts is a manifestation of piping.

 

B. During the excavation operation, the excavator and the earth-moving vehicle are on the side of the steel sheet pile, which increases the ground load of the soil and causes the pile top to move sideways.

 

3) Prevention measures:

 

The embedded depth of steel sheet piles must be determined by calculation and implemented in accordance with the "Technical Regulations for Building Foundation Pit Support" (JGJ 120-1999). Excavators and earth-moving vehicles are not allowed to operate near the foundation pit. If construction is necessary, the load should be included in the design to increase the depth of the pile. In general Larsen pile construction, compaction grouting is used in conjunction with steel sheet pile support around it. The base water pressure is relatively high. In order to better waterproof, the base is compacted and grouted, and its thickness depends on the soil quality. In addition, the corners of the steel sheet pile support are not tightly connected, and quicksand should occur. Therefore, compaction grouting is required, for example, the number of grouting is 3 to 4. If the groundwater level is high, light well point dewatering coordination is required.

 

 

 

Co-connect

 

1) Phenomenon: When the sheet pile is driven, it sinks together with the driven adjacent pile.

 

2) Reason analysis:

 

The inclined bending of the steel sheet pile increases the resistance of the notch and often makes the adjacent piles super deep.

 

3) Prevention measures:

① Correct the inclination of the sheet pile in time;

② Use angle steel electric welding to temporarily fix one or several piles of co-connected piles and other piles.

Article source: https://article-realm.com/article/Internet-Business/Security/15395-Common-phenomena-and-preventive-measures-of-steel-sheet-pile-construction.html

Comments

No comments have been left here yet. Be the first who will do it.
Safety

captchaPlease input letters you see on the image.
Click on image to redraw.

Reviews

Guest

Overall Rating:

Statistics

Members
Members: 17030
Publishing
Articles: 79,416
Categories: 202
Online
Active Users: 2476
Members: 5
Guests: 2471
Bots: 21461
Visits last 24h (live): 9116
Visits last 24h (bots): 60020

Latest Comments

아주 좋은 블로그 게시물. 다시 한 번 감사드립니다. 멋있는.   개미카지노    
귀하의 블로그가 너무 놀랍습니다. 나는 내가보고있는 것을 쉽게 발견했다. 또한 콘텐츠 품질이 굉장합니다. 넛지 주셔서 감사합니다! 텐텐 도메인 공식 주소  
The Tigernut Milk Market is such an interesting niche to follow, especially as more people explore dairy-free and naturally sweet alternatives. I like how tigernut milk offers a different profile...
on Sep 15, 2026 about Tigernut Milk Market
나는 당신이 이것에 배치 한 각각의 공연을 즐깁니다. 정말 유용한 곳이 될 거라고 확신합니다. 나는 또한 기뻤다. 잘 했어!   나루토벳    
이 주제에 대한 흥미롭고 흥미로운 정보는 볼 가치가있는 프로필에서 찾을 수 있습니다. 짱구 도메인 공식 주소  
안녕하세요. GOOGLE을 사용하여 블로그를 찾았습니다. 이것은 아주 잘 쓰여진 기사입니다. 나는 그것을 북마크하고 당신의 유용한 정보를 더 읽기 위해 돌아올 것입니다. 게시물 주셔서 감사합니다. 꼭 돌아 올게요.   나루토벳    
Pemerintah Indonesia, persetan dengan situs web ini, mereka menipu orang. maxslot88 scam  
Para penipu yang memalukan memangsa orang-orang dengan klaim palsu dan kebohongan.  maxslot88 scam    
Pemerintah Indonesia, persetan dengan para penipu itu, tangkap mereka dan persetan dengan mereka karena telah menipu banyak orang. maxslot88 scam  
Halaman ini dikelola oleh para penipu brengsek, hanya berisi kebohongan, janji palsu, dan trik murahan. Hindari orang-orang bodoh ini.  maxslot88 scam  

Translate To: